Scaffold

A scaffold is only safe once it's complete and handed over. Until the tag says go, it stays off-limits.

Field guideOwner · Site SupervisorRPD WHS Manual V8.0
Start safeControl the riskStop when it changes
Scroll the journey
1

When it applies

If you're doing any of this, this guide is in play.

Fixed scaffold
Mobile scaffold
Minor scaffold
Remedial & painting
Facade & balcony works
2

Before you start

Before the work begins, the Site Supervisor confirms — and you check your own work area.

Ground / support capacity

Scaffold design need

Licence class

Loading & ties

Public interface

Exclusion zones

3

The controls

Work down the hierarchy — collective protection first, PPE last. PPE never carries the job on its own.

EliminateDesign the hazard out
SubstituteUse a lower-risk method
IsolateSeparate people from the hazard
EngineeringGuard, extract, contain
AdminSWMS, permits, training, signage
PPELast line — fitted & worn

The RPD rule

Use full decks, guardrails, midrails, toe boards, safe access and signage. Keep the scaffold clear of excess materials.

Full decksGuardrailsToe boardsSafe accessKeep clear
Hold point — never skip

Scaffold must not be used until it is handed over or inspected by a competent person.

Until the handover tag says it's complete and inspected, the scaffold stays off-limits — no 'just one quick job'.

5

Stop & escalate

See any one of these? The job stops until it's fixed — no exceptions.

  • Altered without re-inspection
  • Damaged or incomplete
  • Overloaded
  • Severe weather impact — tag out & restrict access
Stop work→ tell the Site Supervisor → don't restart until the control is back and the SWMS is reviewed.
6

What gets recorded

The job isn't done until the evidence exists. Live records go in Breadcrumb.

Breadcrumb · live site

  • SWMS
  • Permits where required
  • Pre-starts & toolbox talks
  • Site alerts for incomplete scaffold
  • Access controls for restricted areas