QG
05
RPD WHS · Quick Guide

Lead Paint

Old coatings hide lead. Disturb them wrong and you carry it home. Contain it, control the dust, and clean up clean.

Field guideOwner · Site SupervisorRPD WHS Manual V8.0
Start safeControl the riskStop when it changes
Scroll the journey
1

When it applies

If you're doing any of this, this guide is in play.

Scraping
Sanding
Grinding
Burning
Blasting
Demolition
Repainting old coatings
2

Before you start

Before the work begins, the Site Supervisor confirms — and you check your own work area.

Age of coating

Test results

Method & containment

Waste pathway

Lead-risk work notification

3

The controls

Work down the hierarchy — collective protection first, PPE last. PPE never carries the job on its own.

EliminateDesign the hazard out
SubstituteUse a lower-risk method
IsolateSeparate people from the hazard
EngineeringGuard, extract, contain
AdminSWMS, permits, training, signage
PPELast line — fitted & worn

The RPD rule

Avoid generating dust or fume. Use containment, wet methods, HEPA extraction, hygiene controls, suitable RPE/PPE and controlled waste disposal.

ContainmentWet methodsHEPAHygieneControlled waste
Hold point — never skip

Do not disturb suspect lead paint until the controls and waste pathway are set.

Set the containment and the waste pathway first; once you start disturbing the coating it's too late to plan.

5

Stop & escalate

See any one of these? The job stops until it's fixed — no exceptions.

  • Contamination spreads
  • Workers can't decontaminate
  • Lead-risk triggers health monitoring / notification
Stop work→ tell the Site Supervisor → don't restart until the control is back and the SWMS is reviewed.
6

What gets recorded

The job isn't done until the evidence exists. Live records go in Breadcrumb.

Breadcrumb · live site

  • SWMS
  • SDS
  • Inductions / training records
  • Hazard reporting for suspect lead
  • Site alerts for exclusion / hygiene