Old coatings hide lead. Disturb them wrong and you carry it home. Contain it, control the dust, and clean up clean.
When it applies
If you're doing any of this, this guide is in play.
Before you start
Before the work begins, the Site Supervisor confirms — and you check your own work area.
Age of coating
Test results
Method & containment
Waste pathway
Lead-risk work notification
The controls
Work down the hierarchy — collective protection first, PPE last. PPE never carries the job on its own.
The RPD rule
Avoid generating dust or fume. Use containment, wet methods, HEPA extraction, hygiene controls, suitable RPE/PPE and controlled waste disposal.
ContainmentWet methodsHEPAHygieneControlled wasteDo not disturb suspect lead paint until the controls and waste pathway are set.
Set the containment and the waste pathway first; once you start disturbing the coating it's too late to plan.
Stop & escalate
See any one of these? The job stops until it's fixed — no exceptions.
- Contamination spreads
- Workers can't decontaminate
- Lead-risk triggers health monitoring / notification
What gets recorded
The job isn't done until the evidence exists. Live records go in Breadcrumb.
Breadcrumb · live site
- SWMS
- SDS
- Inductions / training records
- Hazard reporting for suspect lead
- Site alerts for exclusion / hygiene